Cellwood PG50SAMPLE N3 Guida di Installazione Pagina 80

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 90
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 79
leaf relief
leaf relief
78
Installing Leaf Relief
®
on Half-Round Gutters
continued
Spring Clip Bar Hangers continued
Bend tab on Leaf Relief
®
as shown
in Figure 1.
Release spring clip on front of gutter
and bend up back tab holding gutter.
(Figure 2).
Place Leaf Relief
®
on gutter, bend
hanger back tab over the back of
the Leaf Relief
®
. Fasten hanger
spring clip over Leaf Relief
®
(Figure 3).
Continue installing Leaf Relief
®
panels, overlapping 1/2˝, attaching
with screws through Leaf Relief
®
and front lip of gutter every 24˝. As
required, a screw can be inserted
through overlapping panels to reduce
sagging.
Wrap-Around Strap Hangers
(Existing Gutters)
Place first Leaf Relief
®
panel on
gutter in front of hanger and mark
location of strap (see Figure 4).
Cut and notch Leaf Relief
®
as shown
in Figure 5 and lay in position on
gutter.
Place next section of Leaf Relief
®
on gutter, mark location of strap, then
cut and notch as shown in Figure 6.
Every 24"
Mark
1/2"
Mark
1/2"
Mark
Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Vedere la pagina 79
1 2 ... 75 76 77 78 79 80 81 82 83 84 85 ... 89 90

Commenti su questo manuale

Nessun commento